CHAPTER 1. INTRODUCTION

1-1. GENERAL.
1-2. SUPPLEMENTAL TYPE CERTIFICATES.
1-3. KEY ASPECTS OF THE STC APPLICATION PROCESS.

CHAPTER 2. THE STC PROCESS

2-1. GENERAL.
2-2. SUBMITTAL AND EVALUATION OF APPLICATION AND DATA.
2-3. INSPECTION AND TESTING OF COMPONENTS AND SUBASSEMBLIES.
2-4. INSPECTION AND TESTING OF COMPLETE ASSEMBLY AND INSTALLATION
2-5. ISSUANCE OF THE STC.
FIGURE 2-1. STC APPLICATION PROCESS CHECKLIST
FIGURE 2-2. FLOWCHART OF THE STC APPLICATION PROCESS
FIGURE 2-3. STC APPLICANT/FAA PROJECT INITIATION CHECKLIST
FIGURE 2-4. SAMPLE CERTIFICATION PLAN
FIGURE 2-5. SAMPLE COMPLIANCE CHECKLIST FORMAT

CHAPTER 3. APPLICABLE REGULATIONS

3-1. GENERAL
3-2. CERTIFICATION BASIS
3-3. AVAILABILITY OF REGULATIONS
FIGURE 3-1. REGULATIONS MOST COMMONLY USED FOR STC APPLICATIONS

CHAPTER 4. USE OF DESIGNEES

4-1. GENERAL
4-2. DESIGNATED ENGINEERING REPRESENTATIVES
4-3. DESIGNATED MANUFACTURING INSPECTION REPRESENTATIVES
4-4. DESIGNATED AIRWORTHINESS REPRESENTATIVES
4-5. LIST OF DESIGNEES
4-6. RESPONSIBILITIES OF THE APPLICANT

CHAPTER 5. DATA

SECTION 1. REQUIRED DATA

5-1. GENERAL
5-2. DESCRIPTIVE DATA
5-3. SUBSTANTIATING/COMPLIANCE DATA

SECTION 2. THE DRAWING PACKAGE

5-4. GENERAL
5-5. DRAWING NUMBERING SYSTEMS
5-6. DRAWING REVISION LEVELS
5-7. GOOD DRAWING PRACTICES
5-8. TOLERANCES
5-9. DRAWING LIST
5-10. EXAMPLES

SECTION 3. GENERAL GUIDELINES FOR CHECKING DRAWINGS

5-11. GENERAL
5-12. ORDER OF CHECKING

CHAPTER 6. INSPECTIONS

6-1. GENERAL
6-2. CONFORMITY INSPECTIONS
6-3. COMPLIANCE INSPECTIONS
6-4. PARTS MANUFACTURER APPROVAL (PMA) AND PRODUCTION INSPECTIONS
6-5. TYPE INSPECTION AUTHORIZATION

CHAPTER 7. TYPE INSPECTION AUTHORIZATION

7-1. GENERAL
7-2. FAA FORM 8110-1, TYPE INSPECTION AUTHORIZATION
7-3. TIA DESCRIPTION
7-4. TIA SECTION 18. PART I
7-5. TIA SECTION 18. PART II
7-6. TIA SECTION 18. PART III
7-7. SUPPLEMENTAL TYPE INSPECTION REPORT (STIR)

CHAPTER 8. TESTS

8-1. GENERAL
8-2. COMPONENT TESTS
8-3. GROUND TESTS
8-4. FLIGHT TESTS
8-5. SIMULATOR TESTS

CHAPTER 9. ADMINISTRATIVE ACTIONS

9-1. ISSUANCE OF STC
9-2. CANCELLATION OF PROJECT
9-3. TRANSFERRING OWNERSHIP OF AN STC
9-4. USE OF AN AVAILABLE STC
9-5. AMENDMENTS TO STC
9-6. DURATION OF AN STC
9-7. LOSS OF AN STC

APPENDIX A-- EXAMPLE STC CHECK SHEET


For more information on how ASTECH Engineering may be able to help you, please contact Jeff Wilson at astech@cox.net or call 316-304-6157.

© Copyright 1996 ASTECH Engineering. All rights reserved. No part of this document may be reproduced in any form without the expressed written consent of the author.

Keywords: Concept Research Development Integration Integrated Aviation Avionics Aircraft Flight Controls
Autopilots Navigation Guidance Analysis Simulation Software Algorithms Hardware Interfaces
Requirements Engineers HITL FCS GPS FMS UAV Systems