1-1.
GENERAL. 2-1.
GENERAL. CHAPTER
3. APPLICABLE REGULATIONS 3-1.
GENERAL 4-1.
GENERAL SECTION
1. REQUIRED DATA 5-1.
GENERAL SECTION
2. THE DRAWING PACKAGE 5-4.
GENERAL SECTION
3. GENERAL GUIDELINES FOR CHECKING DRAWINGS 5-11.
GENERAL 6-1.
GENERAL CHAPTER
7. TYPE INSPECTION AUTHORIZATION 7-1.
GENERAL 8-1.
GENERAL CHAPTER
9. ADMINISTRATIVE ACTIONS 9-1.
ISSUANCE OF STC
We
help Organizations quickly Conceptualize, Design, Develop,
and Implement Innovative Cost-Effective Solutions for
Avionics, Aircraft, and Flight Guidance-Navigation-Control
Systems.
![]()
![]()
![]()
![]()
![]()
Home
YOU
US
What
We Can
Do
What
We Have
Done
-
On
Learjets
![]()
Why
ASTECH
ASTECH's
Founder
Expert's
Corner
-
FAA STC Process
Links
In
Closing
1-2. SUPPLEMENTAL TYPE CERTIFICATES.
1-3. KEY ASPECTS OF THE STC APPLICATION PROCESS.
2-2. SUBMITTAL AND EVALUATION OF APPLICATION AND DATA.
2-3. INSPECTION AND TESTING OF COMPONENTS AND
SUBASSEMBLIES.
2-4. INSPECTION AND TESTING OF COMPLETE ASSEMBLY AND
INSTALLATION
2-5. ISSUANCE OF THE STC.
FIGURE 2-1. STC APPLICATION PROCESS CHECKLIST
FIGURE 2-2. FLOWCHART OF THE STC APPLICATION PROCESS
FIGURE 2-3. STC APPLICANT/FAA PROJECT INITIATION
CHECKLIST
FIGURE 2-4. SAMPLE CERTIFICATION PLAN
FIGURE 2-5. SAMPLE COMPLIANCE CHECKLIST FORMAT
3-2. CERTIFICATION BASIS
3-3. AVAILABILITY OF REGULATIONS
FIGURE 3-1. REGULATIONS MOST COMMONLY USED FOR STC
APPLICATIONS
4-2. DESIGNATED ENGINEERING REPRESENTATIVES
4-3. DESIGNATED MANUFACTURING INSPECTION REPRESENTATIVES
4-4. DESIGNATED AIRWORTHINESS REPRESENTATIVES
4-5. LIST OF DESIGNEES
4-6. RESPONSIBILITIES OF THE APPLICANT
5-2. DESCRIPTIVE DATA
5-3. SUBSTANTIATING/COMPLIANCE DATA
5-5. DRAWING NUMBERING SYSTEMS
5-6. DRAWING REVISION LEVELS
5-7. GOOD DRAWING PRACTICES
5-8. TOLERANCES
5-9. DRAWING LIST
5-10. EXAMPLES
5-12. ORDER OF CHECKING
6-2. CONFORMITY INSPECTIONS
6-3. COMPLIANCE INSPECTIONS
6-4. PARTS MANUFACTURER APPROVAL (PMA) AND PRODUCTION
INSPECTIONS
6-5. TYPE INSPECTION AUTHORIZATION
7-2. FAA FORM 8110-1, TYPE INSPECTION AUTHORIZATION
7-3. TIA DESCRIPTION
7-4. TIA SECTION 18. PART I
7-5. TIA SECTION 18. PART II
7-6. TIA SECTION 18. PART III
7-7. SUPPLEMENTAL TYPE INSPECTION REPORT (STIR)
8-2. COMPONENT TESTS
8-3. GROUND TESTS
8-4. FLIGHT TESTS
8-5. SIMULATOR TESTS
9-2. CANCELLATION OF PROJECT
9-3. TRANSFERRING OWNERSHIP OF AN STC
9-4. USE OF AN AVAILABLE STC
9-5. AMENDMENTS TO STC
9-6. DURATION OF AN STC
9-7. LOSS OF AN STC
For more information on how ASTECH Engineering may be able
to help you, please contact Jeff Wilson at astech@cox.net
or call 316-304-6157.
© Copyright 1996 ASTECH Engineering. All rights
reserved. No part of this document may be reproduced in any
form without the expressed written consent of the
author.
![]()
Keywords:
Concept Research Development Integration Integrated Aviation
Avionics Aircraft Flight Controls
Autopilots Navigation Guidance Analysis Simulation Software
Algorithms Hardware Interfaces
Requirements Engineers HITL FCS GPS FMS UAV
Systems